Dear visitor! You appear to be using Internet Explorer 6 to view this website. Please be advised that not all functionality or design is available to IE6, and that a newer web browser will improve your experience. Some elements that do not work as intended have been removed so not to cause confusion.

Connection Maximizer

MP2 Connection Maximizer optimizes the train service network with respect to possible passenger connections. Passenger demands are taken into consideration, thereby maximizing the passenger flow capacity via stations. It allows any number of railway and/or bus operators schedules to be loaded and has the capacity to automatically generate thousands of schedule improvements within minutes.

The user receives a quick overview of the effects on:

  • Passenger waiting times
  • Lost/gained connections
  • Resource utilization (requirement of fleet, stations, tracks and more)
  • Diagrams