The partnership between Industrial Optimizers and OAG integrates the entire OAG’s World Wide Schedule database with IO’s MP² features for Connection Building, Market and Competitor analysis, optimal crew deadheading and more. The data is updated on a frequent basis and any amount of schedules from OAG’s WWS can be loaded into the system at the same time.